Maidenhead Waterways
Home       |       Our Aims       |     Trustees & Officers       |       Patron & Sponsors       |     Membership    |     Contact Us


Facebook   Twitter   LinkedIn   MWRG Newsletter  
Current Flow Newsletter

Route Plan

Introduction

The route of the complete waterway starts at The Thames near Cliveden Reach, with the main channel running via the White Brook (Widbrook) to its junction with Strand Water. It then runs southwards via Maidenhead Ditch until it splits at Town Moor into York Stream and Moor Cut which will form te twon centre waterway 'Ring'. Town Moor would be an ideal location for a slipway and turning point for boats, with day moorings. York Stream passes to the west directly into Maidenhead town centre. The previous flood role of the Moor Cut channel on the east, which is now usually dry, was overtaken by the Jubilee River scheme.

Phase 1

Planned Route The Group's priority is to restore and enhance the town centre ‘Ring’ and the southern link to The Thames as a key part of the council's Area Action Plan for the rejuvenation of Maidenhead town centre.

Concentrating on this section first brings the greatest benefit to the town centre at the lowest cost, bringing boats into the heart of the town. The entire waterway has main river status and an irrevocable right of navigation - despite this being impractical at present. The enlarged York Stream runs southwards past Hines Meadow car park, passing through the town centre by the Library and Chapel Arches. A large water basin has been created next to the restored c1825 bridge, in conjunction with Shanly Homes' Chapel Arches development. A second (smaller) water basin has been built on the north side of the bridge, restoring through passage.

The enlarged channel continues down to York Road and then on to rejoin the Moor Cut channel at Green Lane. A new weir, boat rollers, eel and fish pass was completed at Green Lane in 2020, which has lifted and stabilised water levels right through the town centre. Once funding can be secured to complete the eastern Moor Cut channel, the town centre ’Ring’ will allow navigation into and around the town centre, initially by small boats. The planning consent includes provision for a lock alongside the weir, but it is not planned to build this until such time as boats large enough to need a lock can reach the weir.